A Gantt chart shows a project as a set of horizontal bars on a timeline. Each task is one bar. How long the bar is shows how long the task lasts, and where it sits shows when it starts and finishes. In Zoho Analytics you can build one from your project data, and keep it up to date as the project moves. This guide explains what you need, how to build the chart step by step, and the options for styling it.
What a Gantt chart helps with
- Planning. It breaks a project into manageable tasks and places them on a timeline, so you can see what is under way, what is finished, and whether deadlines are being met.
- Spotting problems. Comparing planned timelines with actual progress makes it easier to see bottlenecks, delays, and tasks that overlap and may hold up the project.
- Using people well. It shows how work is spread across tasks, which helps you use your resources efficiently.
What data you need
At least three columns:
| Column |
What it holds |
| A dimension column | The detail about each task, such as its name. |
| A start date column | When each task begins. |
| An end date column | When each task finishes. |
A fourth column, such as a progress percentage, is optional, and is what lets the chart show how far each task has got. You can bring project data into Zoho Analytics from a project management tool through its connectors. For Zoho Projects, see Zoho Projects Updates 2026, which covers syncing in real time.
How to create a Gantt chart
- Open the project data you want to chart.
- Click the Create icon on the side navigation panel, and choose New Chart view.
- Drag columns into the chart designer:
- X-axis: a dimension column, such as the task name.
- Y-axis: the start date column, using the minimum date function, and the end date column, using the maximum date function. That gives you a basic Gantt chart.
- Text, Size, or Tooltip (optional): a measure such as progress as a percentage. It helps you tell tasks in progress from completed ones. On the Text shelf, the completion percentage appears at the end of the bar.
- Click Generate Graph. At first, Zoho Analytics draws a scatter plot.
- Choose Gantt from the visualisation types.
- Set the Default Date Value, which decides what period is shown when the chart opens.
A quick way to remember it: the task goes on the X-axis, and the two dates, earliest start and latest end, go on the Y-axis.
Customising it
Click the Settings icon in the top right corner of the chart designer, and choose Gantt. These are the options specific to this chart. Zoho Analytics also has general chart customisation options.
| Option |
What it does |
| Gantt style: Bar | Shows tasks as horizontal bars along a timeline. Best for detailed planning, with durations and overlaps. |
| Gantt style: Bullet | Shows tasks or milestones as bullet markers. Best for a high-level view of key checkpoints and critical dates. |
| Bar colour | Colours tasks by status, so overall progress is easy to read. It works when you have added a measure column to the Text, Size, or Tooltip shelf. |
| Default Date Value | Sets the period shown when the chart opens: the current week, month, quarter, or year, or a custom range that matches your project's dates. |
The shelves, at a glance
| X-axis |
Y-axis |
Color |
Text, Size, Tooltip |
| One dimension | Two date dimensions, one for start and one for end | Not used | A measure, optional on each |
Not the same as a Gantt bar in a pivot view
This guide is about the Gantt chart, which is a chart view. Zoho Analytics 7.0 also added Gantt bars inside pivot views, which show start and end dates for tasks, orders, or projects within a pivot table. They are a different feature, with their own steps. See Zoho Analytics 7.0 (2026).
What the page does not say
It does not say which plans include the Gantt chart, or how many tasks it can show before it becomes hard to read. It also describes comparing planned timelines with actual progress, but does not show how to put both on one chart. It does not show task dependencies either, although it mentions them in describing the Bar style. Test with your own project data before you promise a client a particular view.
Getting a good Gantt chart: our advice
This section is our own advice, not Zoho's.
- Check your date columns first. The two date columns must be real dates, not text. Dates stored as text are a common cause of a chart that will not draw.
- Keep the task names short, because they sit along an axis, and long names crowd the chart.
- Add a progress measure. A plain bar shows when a task is planned. Colour and text showing progress make the chart useful for running a project.
- Filter to what people need. One chart per project, or per team, is easier to read than every task in the business.
- Use Bullet for executives and Bar for the project team. A senior audience usually wants milestones, and the people doing the work want durations.
- Think about who sees it. Task names and dates can reveal client or staff information. Check sharing before you put a chart on a shared dashboard. This is general guidance and not legal advice.